Windows PTY process tree not fully killed

NousResearch/hermes-agent · cluster 108987 · agent

Data as of

3 open items. Fix attempted, not merged.

The short answer

1open issue
2open PRs
3items grouped
Known?
Yes. 3 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 2 PRs.

These issues and fixes address a bug where killing a Windows PTY process reports success but leaves descendant processes still running. The work focuses on ensuring the entire process tree is reaped on kill.

Open issues1

  • Issue#108987[Bug]: process kill reports success while Windows PTY descendants remain running

Open PRs2

  • PR#108992fix(process): stop Windows PTY descendants from surviving kill
  • PR#124896fix(tools): reap a Windows PTY kill's whole host tree
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.67: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
agent
Closed issues
0
Attempts
0 PRs closed without merging

For your agent

The same facts, typed.