OpenRouter tiered pricing cost estimate fixes
NousResearch/hermes-agent · cluster 109976 · agent
Data as of
3 open items. Fix attempted, not merged.
The short answer
1open issue
2open PRs
4items grouped
- Known?
- Yes. 4 related items grouped here, 0 issues already closed.
- Fix event
- No fix has been merged to main. 1 PR closed without merging; see the attempts below.
- Tracker
- The maintainers' tracker marks this
unresolved. That is separate from the fix event. - Still open
- 1 issue and 2 PRs.
Next step: read the attempts below. Your case may extend or revive that work.
Pick up a Lab taskThese issues and pull requests address a bug where long-context OpenRouter calls were significantly undercounted in cost estimates due to missing tiered pricing overrides. The work involves applying tier-based pricing logic to produce more accurate billing estimates.
Open issues1
- Issue#109976[Bug]: Hermes cost estimate undercounts real OpenRouter billing by up to 4.9× on long-context calls
Open PRs2
1 PR closed without merging
From the close comments: duplicate 1
-
#110793 fix(pricing): apply OpenRouter tiered pricing overrides for long-context cost estimates (#109976) · duplicate →
#110016,#109994
How this cluster was grouped
-
Link evidence (
structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference. -
Pairwise link density
0.50: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36.1.00means every pair is linked.
Pick up a Lab task
Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.
Open the LabAt a glance
- Subsystem
- agent
- Closed issues
- 0
- Attempts
- 1 PR closed without merging