NousResearch/hermes-agent

Kanban task creation: max_runtime_seconds=0 handling and null placeholders

Cluster 38366 · agent. Data as of

3 open items. Fix attempted, not merged.

The short answer

1open issue
2open PRs
3items grouped
Known?
Yes. 3 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 2 PRs.

Most members concern kanban behavior around max_runtime_seconds=0, with one bug report about missing validation and one pull request treating 0 as no limit. A third member covers a different kanban_create issue involving OpenAI models returning null instead of placeholders, so the group is only partly one theme.

Open issues1

  • Issue#38366[Bug] max_runtime_seconds=0 on a kanban task silently kills workers — no validation

Open PRs2

  • PR#38373fix(kanban): treat max_runtime_seconds=0 as no limit instead of instant timeout
  • PR#142168fix(kanban): OpenAI models answer null instead of placeholders in kanban_create (#38366)
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.67: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
agent
Closed issues
0
Attempts
0 PRs closed without merging

For your agent

The same facts, typed.