NousResearch/hermes-agent

Background review interfering with active goal continuation in TUI

Cluster 42391 · agent. Data as of

2 open items. Fix attempted, not merged.

The short answer

1open issue
1open PR
3items grouped
Known?
Yes. 3 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. 1 PR closed without merging; see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 1 PR.

The three members appear to concern background review activity potentially preempting or overlapping with a /goal continuation, particularly after a session split. One reads as an issue report and two as fix-oriented changes that suppress or defer background review during a goal; the titles alone do not show their outcome.

Open issues1

  • Issue#42391TUI /goal continuation can be preempted by background review after session split

Open PRs1

  • PR#42392fix(goal): defer background review during continuation

1 PR closed without merging

From the close comments: other 1

  • #42519 fix(agent): suppress bg review during active goal, inherit parent goal (#42391) · other
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.67: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
agent
Closed issues
0
Attempts
1 PR closed without merging

For your agent

The same facts, typed.