NousResearch/hermes-agent

MCP elicitation schema content missing on accept

Cluster 58778 · mcp. Data as of

3 open items. Fix attempted, not merged.

The short answer

1open issue
2open PRs
4items grouped
Known?
Yes. 4 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. 1 PR closed without merging; see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 2 PRs.

A bug where accepting form-mode MCP elicitations returns empty content instead of the schema's required fields. Multiple fixes address populating elicitation responses with the correct schema data on acceptance.

Open issues1

  • Issue#58778[Bug]: MCP form elicitation returns accept with empty content, causing schema-valid approval prompts to fail closed

Open PRs2

  • PR#58789fix(mcp): populate elicitation content from requested schema on accept
  • PR#62713fix(mcp): answer form-mode elicitations with the schema's required fields

1 PR closed without merging

From the close comments: duplicate 1

  • #59208 fix(mcp): return schema content for approval elicitations · duplicate → #58789, #58778
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.50: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
mcp
Closed issues
0
Attempts
1 PR closed without merging

For your agent

The same facts, typed.