NousResearch/hermes-agent

Fix delegate_task status on invalid output schema

Cluster 96355 · agent. Data as of

2 open items. Fix attempted, not merged.

The short answer

1open issue
1open PR
3items grouped
Known?
Yes. 3 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. 1 PR closed without merging; see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 1 PR.

These items address a bug where delegated tasks incorrectly report a completed status even when the output has schema validation errors. The fixes ensure schema-invalid results from child tasks are reported as failed rather than completed.

Open issues1

  • Issue#96355[Bug]: delegate_task can return completed when output_schema validation fails

Open PRs1

  • PR#96885fix(tools): fail delegate_task closed when output_schema stays invalid

1 PR closed without merging

From the close comments: merged via another change 1

  • #87530 fix(delegation): report schema-invalid child results as failed, not completed · merged via another change → 5ce8f71, #99232, #99049
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.67: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
agent
Closed issues
0
Attempts
1 PR closed without merging

For your agent

The same facts, typed.