NousResearch/hermes-agent

CI gate incorrectly passes when jobs are cancelled

Cluster 98557 · other. Data as of

2 open items. Fix attempted, not merged.

The short answer

1open issue
1open PR
3items grouped
Known?
Yes. 3 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. 1 PR closed without merging; see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 1 PR.

These issues and PRs concern a bug where the all-checks-pass aggregate gate reports success even when underlying jobs are cancelled or skipped. The work involves fixing the CI logic to treat cancelled jobs as failures.

Open issues1

  • Issue#98557all-checks-pass reports success when detect is cancelled and every lane skips

Open PRs1

  • PR#98684fix(ci): count cancelled jobs as failures in all-checks-pass

1 PR closed without merging

From the close comments: superseded by another PR 1

  • #98563 fix(ci): fail aggregate gate on cancelled jobs · superseded by another PR → #98684, #103195
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.67: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
other
Closed issues
0
Attempts
1 PR closed without merging

For your agent

The same facts, typed.