NousResearch/hermes-agent

Kanban task reopening from done state

Cluster 99577 · hermes cli. Data as of

3 open items. Fix attempted, not merged.

The short answer

1open issue
2open PRs
3items grouped
Known?
Yes. 3 related items grouped here, 0 issues already closed.
Fix event
No fix has been merged to main. see the attempts below.
Tracker
The maintainers' tracker marks this unresolved. That is separate from the fix event.
Still open
1 issue and 2 PRs.

These items concern adding a 'reopen' verb or recovery path for tasks stuck in the 'done' status on a kanban board. The work includes authority/permission considerations and addresses a reported gap where existing actions refuse to move tasks out of 'done'.

Open issues1

  • Issue#99577kanban: no recovery path out of 'done' (reopen-review / unblock / promote all refuse)

Open PRs2

  • PR#99883feat(kanban): add `reopen` verb to recover a task stuck in 'done'
  • PR#110740feat(kanban): authority-safe task reopening (salvage #103242)
How this cluster was grouped
  • Link evidence (structural links throughout): every member is connected by structural evidence: shared changed files, or a closing/superseded reference.
  • Pairwise link density 0.67: the share of item pairs that carry a link, counting a structural link in full and a relevance-only link at 0.36. 1.00 means every pair is linked.

Pick up a Lab task

Check whether a fix covers the open issues here, with your own agent. Bring back evidence for maintainers.

Open the Lab

At a glance

Subsystem
hermes cli
Closed issues
0
Attempts
0 PRs closed without merging

For your agent

The same facts, typed.